B2Win Suite Documentation (Under Construction)
5.4
5.4
  • B2Win Suite Documentation
  • Scripting
    • B2Win Suite Scripting Overview
    • Scripting in B2Data
      • Custom Script Nodes
        • Custom Script
        • Source Script Node (File)
        • Source Script Node (Table)
        • Source Script Node (Object)
        • If-Else Condition
        • Condition Node
      • In DataPrep
      • Properties
      • Workflow Applications
        • Workflow #1
        • Workflow #2
    • Getting Started
    • Language Basics
    • Types & Objects
      • Primitives
      • Objects
        • Instant
        • LocalDateTime
        • LocalDate
        • LocalTime
        • JsonNode
        • ObjectNode
        • File
        • SuiteTable
        • Duration
      • Arrays & Maps
      • Row, Column, StringColumn
    • Utilities
      • Date & Time
        • InstantUtil
        • GeneralDateUtil
        • LocalDateTimeUtil
        • LocalDateUtil
        • LocalTimeUtil
        • Formatting
        • Timezones
      • Math
      • StrictMath
      • NumericUtil
      • DbUtil
      • DbExecutor
      • StateUtil
      • FileUtil
      • JsonUtil
      • HttpUtil
      • NodeInputReader
      • RandomUtil
      • HashingUtil
      • CompressionUtil
      • Logging
    • Properties
    • Context and System
      • Context
      • System
    • Configurations
      • Workflow Configuration
    • Tutorial
    • Feedback
  • B2Data
    • Workflow Settings
      • General Settings
      • Global/All Properties
      • Execution Configuration
        • General
        • Runtime
        • Compiler
        • Storage
        • Clean Up
      • Permissions
    • Nodes
      • Scheduler
    • Services Configuration
      • Power BI
Powered by GitBook
On this page
  1. B2Data
  2. Workflow Settings
  3. Execution Configuration

Clean Up

PreviousStorageNextPermissions

Last updated 1 year ago

In the clean up section you can set the workflow to "Auto cleanup run iterations history" after you check the box you will have two settings to chose from:

  • The first option you can enter the number of the maximum iterations to be stored (if you set it to be 0 means no limit, to set the limit write a number greater than 10).

  • The second option is to set the duration of when the clean up will be made (The number is in days make sure to set Cleanup limit to 0).